PROJECT

Proposal to renovate the FRIM Office in Kepong Selangor
-Sub Contract -Pakatan Tenaga Sdn. Bhd.

Build and complete a block, 2 storey Animal Services Office Building in Kuala Selangor
JPS / N / SEL / T / 12/98.
-Pakatan Tenaga Sdn. Bhd.
-Sub-Contract Works

Build and complete one (1) block of four (4) storey at SK Setiawangsa, Kuala Lumpur.
JKR (WP), Kuala Lumpur.
-Pakatan Tenaga Sdn. Bhd.
-Sub-contract works.

The proposed package 4 - intake, pumphouse, pumps and associated equipment and irrigation mains to dpmr for Putrajaya Development, Selangor Darul Ehsan.
-Main Contractor (awarded 15/10/99)

Build and complete one (1) block of four (4) storeys of the national Additional Laboratory building at SMK Bukit Bandaraya, KL.
JKR (WP), Kuala Lumpur.
-Pakatan Tenaga Sdn. Bhd.
-Sub-contract works.

Building the Provision of Physical Infrastructure and Computing in Primary and Secondary Schools .Central Area.
-Sub-Contract Works.
CDS / PC / SC / 39
-Comtrac-Sabkar Development Sdn. Bhd. (A Subsidiary of DRB Hicom).

Construction of one (1) Block Two (2)
Home Economics Workshop Level
Ladder (ERT), At SMV Setapak,
Kuala Lumpur.
Direct awarded.- JKR WP-
K.Lumpur.
-JKR / PERS / WIL / 10/2002.

Construction of five (5) TNB Units Sub
Station at Camp Y, 51st Rajemen,
Royal Artillery, Ministry of Defense
Malaysia, Gemas Negeri Sembilan.
-Sub Contract - Multi Skilled
Engineering Sdn. Bhd.
(Messrs. Target Resources Sdn. Bhd.)

Home Renovation Project
Four Storey Shop To Hostel
Facilities, Lecture Room, Hall
Versatile and office. At KUTPM (
University of Technology College and
Malaysian Management), Section 13,
Shah Alam.
-Direct Awarded

Modifications and Expansion
2 Storey Terrace House, in Section
8, Bandar Baru Bangi, Selangor D.E.
-Direct Awarded.

Proposed Construction And Completion Of 15 Two-Storey Bungalow Units On Lot 3265 For Messrs. Bhd.
-Direct Awarded.

Quotation works at UKM, bangi
1. Upgrading the Sub-Station building.
2. Upgrading the office of Tun Husain Onn College.
-Sub contract - Amcon Enterprise.

Proposed Pusat Latihan Gabungan Pasukan Tempur Training Center Phase II, Sector D Gemas, Negeri Sembilan (The Execution and Completion of Premix, Road Marking, Road Signage, Turfing and Anciallary Works for sector D)
- Subcontract Works - HCM Engineering Sdn. Bhd.

Proposed Construction of Supplementary Building Faculty of Science and Technology (Center for Genetic Analysis and Technology), Universiti Kebangsaan Malaysia, Bangi, Selangor Darul Ehsan.
No. Contract: UKM / JPP / 37 Year 2004.
-Direct Awarded.

Construction / Replacement of phase 1, and two pedestrian walkways.- UKM, Bangi Selangor.
Sub-Contract works:
a.Arena setia.
b.Aim Cemerlang Enterprise.

Upgrading the toilet at Ungku Omar-UKM college, bangi selangor.
Sub-Contract works: -
-Comfort Expand Sdn. Bhd.

PROPOSED WORKS TO UPGRADE EXISTING FUTSAL COURSES FOR UKM BANGI SPORTS CENTER. SELANGOR.
No. Contract: UKM / JPP / 23/2012.
DATE STARTING 12/4/12
DATE FINISH 4/3/13
Delta Prima Sdn Bhd.

Works “House Expension and Renovation at: Nilai 3, Negeri Sembilan, Section 3 and Section 4 Bandar Baru Bangi, Selangor DE.
- Direct Awarded.

CONSTRUCTION OF ONE (1) SUPPLEMENTARY BLOCK BUILDING BUILDING FOUR (4) LEVELS AND OTHER RELATED WORKS AT SK JALAN KUANTAN 1, KUALA LUMPUR.
CONTRACT: JKR / PERS / WIL / 45/2007.

PROPOSAL TO BUILD AND COMPLETE THE 2-LEVEL FAMA DISTRIBUTION CENTER BUILDING BUILDING ON LOT 1622, PULAU KAMBING, KUALA TERENGGANU, TERENGGANU.
CONTRACT: FAMA / PPF-KT / 04-2007

Proposed Upgrading Weight Lifting Training Center (National) In Kg. Kolam, Mukim Rompin, Pahang Darul Makmur For National Sports Council.
No. Contract: MSN / BPK / BKLN / T / 03/07

PROPOSAL TO BUILD AND COMPLETE ONE (1) ADDITIONAL BUILDING BLOCK FACULTY OF INFORMATION TECHNOLOGY AND SCIENCE (FTSM), UNIVERSITI KEBANGSAAN MALAYSIA, BANGI, SELANGOR D.E.
No. Contract: UKM / JPP / 17/2008.

PROPOSED WORKS TO IMPROVE DEPOH FACILITIES AND RELATED WORKS AT FAMA HEADQUARTERS, SELAYANG SELANGOR.
No. Contract: FAMA / COE –BBS / 04-2013.
DATE START 10/10/2013
DATE FINISH 9/5/2014
For Messages: Call Times Engineering Sdn. Bhd.

BUILDING THE TAHFIZ AL QURAAN AT-TOYYIBAH CENTER, A NEW CAMPUS IN KG. SG BUAH, SEPANG, SELANGOR.
MAIN CONTRACTOR
PHASE ONE
-TEMPORARY HOSTEL BUILDING.
-STUDY ROOM.
-INFRASTRUCTURE AND EXT. WORKS.
-SURAU 2 LEVELS.

To be continue.